Consultant Hiring for Coal Mining Equipment Systems Design and Commissioning
At a glance
Tender by Ministry of Coal in Chhattisgarh. It closes on 1 Dec 2026, 6 days from now.
- Issuing entity
- Ministry of Coal
- Ministry / department
- Ministry of Coal / COAL INDIA LIMITED
- Delivery location
- Chhattisgarh
- Portal
- GeM — Government e-Marketplace
- Category
- consulting
- Published
- 14 Nov 2026
- Deadline
- 1 Dec 2026
- Status
- open
- Last updated
- 23 Nov 2026
Summary
South Eastern Coalfields Limited seeks consultant engagement for planning, design, engineering, construction, and commissioning of pre-weighed bin truck loading systems and in-pit conveyor systems at coal mining operations. The engagement is structured on a milestone/deliverable basis with a 3-month contract period, covering full project lifecycle from design through performance testing and commissioning.
Documents
- GEM_2026_B_8251811.pdf
Browse more
Related tenders
- Project Development and Management Consultancy – 3 Year Engagement closes 2 Dec 2026
- IT Security and Technology Consultancy Services closes 25 Nov 2026
- Consultancy Services for NABL Laboratory Accreditation Documentation closes 25 Nov 2026
- Asset Valuation Services with Due Diligence and Review closes 25 Nov 2026
- Technology Consultants for Engineering Design and Soil Investigation closes 26 Nov 2026
- Asset Valuation Services for Offsite Assets closes 26 Nov 2026