Prefabricated Pota Cabin Construction at Three Bihar Jails
- Portal
- Bihar eProc 2.0 (mjunction)
- Published
- 19 Sept 2026
- Deadline
- 28 Oct 2026
- Opening date
- 29 Oct 2026
- Status
- Closed
Summary
EPC (Engineering, Procurement and Construction) contract for construction of 3 prefabricated/pre-engineered Pota cabins at Muzaffarpur Central Jail, Hajipur Divisional Jail, and Sitamarhi Divisional Jail. The contractor must design, procure materials, and complete installation within 5 months.
Description
Construction of Prefabricated/ Pre-engineered Pota cabin in Jail on EPC (Engineering Procurement and Construction) basis at Muzaffarpur Central Jail, Hajipur Divisional Jail and Sitamarhi, Divisional Jail. (Total no of Cabin = 03 Nos)
Documents
- 33139_NITANDPC20.pdf
- 40705_Muzaffarpur Pota.doc
- 36219_Muzaffarpur Pota Cabin.xlsx
- 83426_Evalution upto 2 Cr.pdf