Steel Pipeline Network Development for CNG Spur Line at Panipat
- Issuing entity
- Indian Oil-Adani Gas Private Limited
- Portal
- CPPP — Central Public Procurement Portal (Drupal)
- Published
- 25 Jul 2026
- Deadline
- 3 Aug 2026
- Opening date
- 4 Aug 2026
- Status
- Closed
Summary
Development and installation of 8-inch and 4-inch diameter steel pipeline networks for CNG spur line connectivity at IOAGPL's Panipat facility. This work involves pipeline design, fabrication, and installation to expand CNG distribution infrastructure at the designated gas processing location.
Check if your business qualifies — free